Project Starting Date 12.01.2016 Project End In Progress Category Goods Project Description Deliver 2,000 MT of Mono-ethylene Glycol (MEG) to West Seno FPU. The Challenge Deliver Mono-ethylene Glycol (MEG) with a very sensitive characteristic is a very challenging for Lamurindo team. We have to maintain a 99,9% purity, less...
Read MoreProject Starting Date 12.01.2016 Project End In Progress Category Engineering Project Description Due to the remote location that is difficult to be accessed by road. We built a storage tank to avoid any unnecessary delays in supply due to the unpredictable terrain & weather along the journey. The Challenge...
Read MoreProject Starting Date 12.01.2016 Project End In Progress Category Lab services Project Description Provide lab services at site to analyze chemicals’ performance periodically. This may greatly help in cost and time saving in troubleshooting and quality check on site. The Design We create a lab in a 20ft container...
Read MoreProject Starting Date 12.01.2016 Project End In Progress Category Goods Project Description Providing water treatment chemicals to ExxonMobil Cepu. The Challenge in the design ExxonMobil requires packaging that are safe to be used onshore and able to be connected directly to plant’s injection point. Providing a Stainless Steel Packaging...
Read MoreProject Starting Date 12.01.2016 Project End In Progress Category Gas treating & corrosion chemicals Project Description Supplying of gas treating chemicals and corrosion inhibitors to Ophir Energy at Luwe Hulu. The Challenge in the transportation Road condition is the biggest challenge as Luwe Hulu is located in the center...
Read More